Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
LONKIA Steam peeling machine mainly used for potatoes, sweet potatoes, carrots and other vegetables peeled tubers front surface burst handling, especially for uneven and irregular shape of the material peeled. With high peeling rate, low loss rate, smooth surface after peeling, suitable for largescale production ,etc.
The materials enter the weighing silo in batches by the hoist, set the weighing value (60 ~ 100kg) on the weighing instrument according to the process requirements, and control the opening and closing of the silo door and the feeding hoist through the weight sensor. Set the speed on the touch screen (3 ~ 8R / min), start the pressure tank transmission reducer.
When the weight of the weighing silo reaches the set value, the cylinder door of the pressure tank is positioned upward by the sensor, the feeding elevator is automatically stopped, the feeding cylinder door and silo door are automatically opened, and the materials enter the pressure tank; when the weight of the weighing silo is zero, the silo door is automatically closed, the feeding elevator is automatically started, and the feeding and discharging cylinder door is closed at the same time, Open the steam inlet valve, close the steam exhaust valve and start the rotation of the pressure tank.
When the set rotation time is reached, the pressure tank stops rotating and the cylinder valve of the pressure tank is positioned downward by the sensor. Close the steam inlet valve, open the steam exhaust valve, open the discharge cylinder valve and discharge the material into the hopper of the discharge elevator.
When the material is discharged, the cylinder valve of the pressure tank is positioned upward by the sensor, Repeat the above process again.
Pressure tank volume
|
0.3 m3(material:16MnR)
|
Steam working pressure
|
1.2~1.5MPa
|
Pressure tank working medium
|
saturated steam
|
Pressure tank temperature
|
250°C
|
Pressure tank speed
|
8rpm
|
Capacity
|
1-20T/H(raw material)
|
Each feed capacity
|
100-500kg
|
Total power
|
6.2kw
|
Exhaust tank volume
|
1 m3(material: Q235)
|
Compressed air
|
pressure≤0.7Mpa, consumption:0.2m3
|
Size
|
L3800*W2700*H4600mm
|
Weight
|
3500kg
|
Q1: Are you factories? What do you mainly do?
A1: Yes, LONKIA is mainly engaged in central kitchen vegetable cleaning and drying production lines, plastic basket and tray washing machines, potato chip production lines, fruit and vegetable processing production lines, pasteurization production lines, thawing production lines, high-temperature fryers, low-temperature vacuum fryers, fried line, large industrial steaming and baking machine, steam peeling machine, etc.
Q2: Where is your factory? Which port is close to?
A2: Our factory is in Zhucheng, Shandong, China, and is very close to Qingdao Port.
Q3: Can you provide on-site installation?
A3: Yes, We provide, please contact our business manager for specific details.
Q4:What's your company after-sales service?
A4: Our machine will be checked three times before shipment to ensure that the machine itself has no problems. If the machine has some problems under incorrect operation:
1. improper operation problem, we will solve all the usage problems by video call.
2.machine parts problem, we will send you accessories to ensure the normal use of the machine.
3.In addition, our engineers go abroad every year to help customers solve problems they cannot solve. Give customers the best quality machine, the best service,Is the standard of our company.
Q5:Any warranty?
A5:One year warranty. Frankly speaking, The quality of our machines is very stable. The machine will be tested three times before leaving the factory to ensure that the machine is in the best condition when it arrives at your address. Some minor problems of the machine are usually caused by incorrect operation by novices, so we provide a full set of English instruction videos and common problem solving videos, To help users better understand it. On the other hand, we put a set of spare parts in the toolbox of the machine in advance. During your use, if you need any spare parts, we can send it to you via UPS, and it only takes 5-7 days to arrive at your door. During use, if you have any questions, we can make a video call at any time.